Sea trials scheduled today as countdown proceeds
Position:
53 11 S, 70 55 W
Today's Report
Sea trials were to be held today as Saito sought to confirm the repairs to Nicole BMW Shuten-dohji III.
Key among these are the replaced jib furler system, rudder, engine and propeller, and the crucial self-steering hydraulic rudder control.
No word had been received from him by 5 pm JST on the outcome.
If everything checks out during the sea trials he will leave tomorrow at 8 am local time, 6 months almost to the day after the 56-foot yacht was disabled April 12 at Cape Horn.